What are the MOQ and lead time for pigments?
MOQ is 1 kg for a stock grade and 25 kg for a production quantity; some specialty lakes have a 5 kg minimum because they are made to order. Lead time is 7–15 working days, longer for a non-stock lake.
Samples ship at 100 g to 1 kg with COA and TDS. For a lake you have not used before, take a sample and run a stability trial in your own base before committing to a production quantity — that is cheaper than discovering a pH interaction after the batch is made.