What is the MOQ and lead time?
MOQ is 5 kg for a stock grade and 25 kg for production. Lead time 7–15 working days, samples 1 kg.
Shelf life is typically 12 months for water-based products, shorter than the oil-based range because the carrier is aqueous. Store between 15 and 30 °C, protect from freezing, and use within the stated period.
If your production cycle is long, order against your consumption rate rather than stocking up — a water-based slurry sitting for two years is a preservation question you do not want to have.