001The powder arrived caked. Can this batch still be used?Separate soft caking from hard caking first. If the lumps break under light hand pressure and leave no hard residue on a 40-mesh sieve, it is soft caking — usually caused by transport vibration plus s…
002This batch looks visibly different in colour from the last one. How much colour difference counts as a reject?Rule out sample preparation first: a finer particle size reads whiter and brighter, and pressing pressure and substrate shift the numbers considerably. Only ΔE measured under identical preparation — s…
003The bulk shipment does not perform like the sample we approved. Where do we start?Four checks, in order — most issues are found before the fourth. 1. Same specification: grade, surface treatment type and coating level, particle size band. One difference changes the hand feel. 2. Fo…
004Our retest gives different D50, whiteness and oil absorption values from your COA. Which one stands?Compare test conditions before comparing numbers. D50 depends on dispersion medium, dispersant type and dose, ultrasonic power and duration — a 10–20% spread between condition sets is common. Whitenes…
005Our incoming test flagged abnormal microbiology or heavy metals. Does the whole batch have to be scrapped?Establish whether the finding holds before deciding on disposition. Three things to confirm: whether sampling was representative (multi-point, avoiding the surface layer), whether the test method matc…
006The powder will not disperse in our system and leaves specks. Is it the material or the process?An isolation test settles it: disperse this powder alone in the same medium, with no other powders and no other additives. If specks remain, the cause is the powder itself (hard agglomeration or moist…
007How long can the powder be stored, and can an expired batch be downgraded to another use?Unopened, sealed and stored cool and dry (≤30 °C, RH ≤60% recommended), standard grades carry a 24-month shelf life; the COA marking governs. Past shelf life does not automatically mean unusable, but …
008After switching to a different base oil, the surface-treated powder floats. Is the treatment layer coming off?Usually it is not the coating coming off — it is a change in compatibility. Surface treatment (silicone, fluorine, amino acid) sets the hydrophilic-lipophilic balance of the powder. Changing the base …
009The packaging was damaged in transit and the powder is contaminated. What now?Three things on site: do not open the bag, do not decant, do not sieve. Quarantine the whole package and take four photographs — outer carton, breach, batch label, powder condition. Send us three thin…
010If we need technical support, should we send samples or arrange a site visit?Both are possible, and anything that can be resolved remotely does not need a visit. Samples: 500 g each of the same-batch retention sample and the problem sample, with system composition (redacted is…
011On what basis is a quality complaint judged, and what is the process?Three bases: the quality agreement or purchase contract signed by both parties, the specifications and test methods stated on the COA, and the agreed arbitration testing route. Where none of the three…
012How do we confirm that only one batch is affected?Through batch traceability. Our records cover three things: raw material lot, production batch, and retention sample plus shipment routing. Given a batch number, we can tell which customers received t…
013After a batch fails, should it be returned, replaced or accepted at a discount?The remedy follows from whether the material can still be used, not from who is more at fault. Return: the lot goes back or is destroyed in place. Freight, customs and destruction costs have to be all…